A GUIDE FOR THE INSTALLATION OF A FIBREGLASS POOL SHELL 

  •  Select the position for the pool installation select a fixed datum point like a concrete patio or a mark on the fence. This datum point will then become the reference point for all measurements. Mark out the shape of the pool and dig the hole 80mm  wider than the shape of the pool shell. The depth of the excavation should be the same as the depth of The pool shell plus an extra 150mm. to allow far the sand bed for the base of the pool shell. A water level can be used for the excavation and levelling the pool shell. If the depths of the pool shell is 1800 mm to 1000 mm then the depths of the excavation should be 1800 mm at the deep end and 1000mm  at the shallow end, all measurements are in relation to the datum point. When the excavation has been completed, the sand can be placed and screeded to exact depths of the pool shell (1800mm to 1000 mm). Course river sand or crusher dust  can be used for the bed of the pool. Fit the skimmer box to the pool shell and the pool return fittings, and the hydrostatic relief valve.The shell is then placed into the excavation with a crane using a spredder bar.
  • Check the top of the pool for correct levels before the crane is dismissed, in case the pool has to be removed. After the pool shell has been placed and the levels are correct, place a  90mm plastic pipe at the deep end of the pool next to the skimner box. This pipe must end up below the base of the floor of the shell, this pipe is so access will be available to pump out any excess water that may be around the excavation.
  • The pool is now read to start filling with water. When you are filling the pool with water you must do a dry 8 x 1 sand and cerment mix around the outside of the pool. 8 x Sand to 1 x Cement mix, do not wet or pack the backfill accept for packing under the step area Bring the water level and the backfil up at the same level together to avoid external & internal pressure on the pool shell in other words always keep the levels the same as you are filling the pool. You can do about 200 mil high of backfill around the base before you start to fill the pool with water just to hold the shell in posion while you fill & backfill The plumbing can now be connected. The pipe to use is class 9 pressure pipe, the pipe from the skimmer box to the pump is 50mm and the pool returns can be 50m or 40mm pipe.
  • Continue filling the pool with water until1 the water level is aprox, 40mm below the top of the skimmer box opening. The backfilling can now be completed. The sand and cement back fill can be tampered if necessary to obtain the natural  shape of the shell. The concrete bondbeam can now be constructed after 2 days from the completion of the backfilling. The concrete bondbeam is a structual part of the pool construction, details as per specifications on plans.
 

 
PLEASE TAKE NOTE THESE ARE NOT INSTRUCTIONS FROM SWIMMING POOL KITS DIRECT THEY WERE DOWNLOADED FROM THE INTERNET AND IN NO WAY SHOULD BE CONSTRUED AS INSTRUCTIONS SUPPLIED FROM US THEY ARE A GUIDE ONLY AND YOU SHOULD UNDERSTAND WE ARE NOT AND WILL NOT TAKE ANY RESPOSIBILITY FOR THE INSTALLATION OF A KIT PURCHASED FROM US B Y YOU, BUT AS LONG AS THEY ARE INSTALLED TO ENGINEERS SPECIFICATIONS MANUFACTURERS WARRANTY WILL APPLY.
 
Options
  1. DO IT YOURSELF: From start to finish watch the video do you know someone with an excavator or bobcat perhaps you have a buider or concreter friend who can help you? Once the pools is level its a piece of cake. Excavate hole put 100mm of sand in the hole screed off level  pre-plum pool with fittings put the pool in the ground with the excavator then check your levels then if your happy with the pool being  level start backfilling with a dry sand cement mixture 8 sand to one cement. Dot pack it or wet it just push it in the hole as you fill the pool with water bringing them both up together,when the water reaches the returns and just below the skimmer connect up your 40 or 50mm pvc pressure pipe and then connect your filtration see diagram. Let it set for 24hrs fill the rest of the pool and there you go. Okay then you have to do a concrete bondbeam around the pool the best way to do this is follow the engineers details or ring and we will expalin this to you.
  2. SUPERVISED INSTALLATION. Some people feel they could do it on there own but just need a bit of supervison this can be arranged for you. As a D.I.Y KIT you will still save thousands.
  3. Deal direct with the Installer and cut us out we wont make any profit out of the installation you can negotiate direct with the FULLY LICENSED INSTALLER AND STILL SAVE.
 