[google-translator]

8m Centurion | Laem Mae Phim

Day 1
Excavate and remove the dirt. Prepare a sand base…

Day 2
Place the pool full with water and do backfill at the same time.
Place the pump and filter on a concrete slab.
Connect all plumbing.

Place the pump and filter on a concrete slab.
Connect all plumbing.

Day 4 – 5
Instruct the Customer on Pool Care and Cleaning.
Clean up out the gate.
ALL DONE
OF TILING

 


Dimensions: 8m x 4.2m x 1.3m D

Installation only in 4 days From Start to Swimming —Jan of Laem Mae Phim

 ANOTHER HAPPY CUSTOMER!

Email Now! Tell us where you are & which size of the pool you like. E: swimspas@gmail.com or Ring me | Rob Lennan M: 0843365905 

Comments are closed.